Analysis Protocol¶
The core method. Run it on one work unit: a role, process, task or system. Output goes into a case file (template).
Before starting¶
- Name the work unit precisely.
- Name the reference system (team, organization, customer base…). Waste and value depend on it.
- State what you already believe about it (the default view). Usefulness is measured against this.
Steps¶
1. FLOW Which flow does it touch?
Primary function: access / convert / maintain / steer / allocate / explore
Secondary functions:
2. CONSTRAINT What constraint does it build, maintain or use?
What would the flow do without it?
3. LEVERAGE What information does it hold or apply?
Who is the receiver? Does the receiver match (can it act on it)?
Mode: select (trigger existing behavior) or instruct (build new constraint)?
If instruct: which assembler, at what cost?
Feedback: open-loop (biases odds) or closed-loop (steers)?
Handoffs: how many receivers between source and steered flow?
Is there correction at each handoff?
Small effort → how large a flow? (rough ratio or qualitative: low/med/high)
4. SELECTOR Who decides it continues? What do they actually measure?
Gap between metric and real flow?
Speed and accuracy of that feedback?
5. VARIATION How do new ways of doing it appear?
What does trying a variant cost? Who is allowed to try?
6. WASTE Deletion test: what decays if it stops, how fast, who notices first?
Does its output consume receivers without steering? (negative leverage, 240)
Verdict: needed / buffer / vestigial / self-serving / search cost
7. EXPOSURE Which of its functions is getting cheaper (AI, automation, tooling)?
Where does scarcity move?
Is verification of its output cheap and formal, or slow and
grounded in real flows? (D26)
Does it depend on store (deep, grounded expertise) or on
working set (breadth, parallel effort)? (D23, D24)
If AI does part of it: open or closed loop, how many agent
handoffs, who receives the output? (D17, D20)
8. LEVERS What can change? (see Change Levers)
flow · constraint · information · selector · variation
9. IMPACT Per level, for the chosen lever:
result / team / org / customers / economy
effect on flow · sign (+/–) · delay · who notices
Quick version (5 minutes)¶
- Primary function?
- Who selects it, on what metric?
- What decays if it stops, and who notices first?
- Which part is getting cheap?
- One lever and its effect on the next level up.
Output check¶
- Did any step produce something you didn't already believe? If not, note it: either the default view is right or the step is weak.
- Which steps were guesses? Mark them.
Known weak steps¶
Steps 3 (leverage) and 9 (impact) are the least operational. Expect them to change after the first cases.